Case Study

Energy autonomy for critical processes in the pharmaceutical industry by means of power generation

Hot Air icon

Electricity

Electricity generation

CONSUMPTION
6,249,880 (100%)
GENERATION
6,249,880 (100%)

INSTALLED EQUIPMENT

1 Microturbina C1000

FUEL

Gas natural

RESULTS

Electricity demand met: 6,249 kWh (value reflected in the system as direct metered use)

Description

In 2012, DTC Soluciones and a Mexican company dedicated to the manufacture of personal health products implemented a natural gas power generation system to ensure a constant and reliable energy supply for its plant, key in processes with strict regulatory and sanitary standards.

A 1 MW capacity unit (C1000) operating on natural gas was installed, designed to supply the plant's electrical demand on a continuous basis. Although the system did not include thermal recovery (0%), its focus was to achieve total electrical autonomy to mitigate operational and production risks.